Mineral Processing Projects Mining Engineering Design

Product Details
Customization: Available
Design Software: 3D Software
Design Phase: All Phases
Still deciding? Get samples of US$ 30000/Set
Request Sample

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
400000000 USD
Type of Ownership
Limited Company
  • Mineral Processing Projects Mining Engineering Design
  • Mineral Processing Projects Mining Engineering Design
  • Mineral Processing Projects Mining Engineering Design
  • Mineral Processing Projects Mining Engineering Design
  • Mineral Processing Projects Mining Engineering Design
  • Mineral Processing Projects Mining Engineering Design
Find Similar Products

Basic Info.

Clients
Mining Industries
Design Scale
2-2000t/h
Design Period
2-18 Months
Design Standard
ISO, GB/T
Transport Package
Containerized
Specification
Various
Trademark
HZE
Origin
China
Production Capacity
5 Sets/Year

Product Description

Mineral Processing Projects Mining Engineering Design
 
The team of HZE has extensive design experience in the field of mineral processing and has designed many projects worldwide. The main project categories are as follows:
(1) Crushing plants and grinding plants;
(2) Gold and silver heap leaching, vat leaching, cyanide leaching plants;
(3) Alluvial gold processing plants;
(4) Gold and silver elution, electrowinning and smelting plants;
(5) Froth flotation plants;
(6) Gravity separation / concentration plants;
(7) Mineral thickening, dewatering and water recycling plants;
(8) Tailings re-recovery processing plants;
(9) Mobile modular mineral processing plants.
The engineering design of HZE includes scheme design, preliminary design and detailed design. It fully adopts 3D design software and comprehensively considers the harmony and unity of the general plan, process, layout, equipment association, circuit, pipeline, installation, commissioning, operation and maintenance. Communication throughout the implementation of the project, thereby reducing engineering costs, shortening the construction period, improving efficiency, facilitating management, and avoiding omissions.
The three phases of engineering design are:

Scheme Design
Process Flow-sheet Diagram (PFD)
Process Control Diagram (PCD)
Processing Instruction
Materials Balance List
Equipment List
Processing Data List
Rough Layout
Design Document of All Majors

Mineral Processing Projects Mining Engineering Design

Preliminary Design
Process Flow-sheet Diagram (PFD)
Process Control Diagram (PCD)
Pipeline Instrument Diagram (PID)
Design Instruction (all majors included)
Equipment List
General Layout
Purchase Requisition Document
Equipment Layout (Subarea)
Pipeline Plan Drawing (Subarea)
Construction Structures Connection Diagram
Electric Single Line Drawing
Automation Single Line Drawing

Mineral Processing Projects Mining Engineering Design

Detailed Design
Detailed Processing Plan & Elevation Drawings
Detailed Pipeline Drawings
Civil Detailed Drawings
Instrument Layout Drawings
Electric Detailed Drawings
Automation Detailed Drawings
Structural Parts Manufacture Drawings
Non-standard Equipment Manufacture Drawings
Other Drawings Needed for Construction

Mineral Processing Projects Mining Engineering Design

Mineral Processing Projects Mining Engineering Design
Mineral Processing Projects Mining Engineering Design
1. What is the main business scope of your company?
HZE is a company with R&D center, design institute, manufacturing factories, installation and commissioning teams. Our customers are in the mining and mineral processing fields. Our major businesses include mineral processing EPC (engineering, procurement and construction), project consultation, engineering design, mineral processing equipment manufacturing, on-site installation, commissioning, staff training, customer project operation management, spare parts supply and technical support. Customers are free to choose any one or any combination of our services.

Mineral Processing Projects Mining Engineering Design
2. What are the outstanding advantages of your company?

The one-stop service of mineral processing engineering project and equipment is our core competitiveness.
The most important feature that HZE distinguishes itself from other engineering companies, design companies or consulting companies is that we are also an equipment manufacturer with a production plant of 50,000 square meters, and we have complete manufacturing rout and the related equipment.
HZE distinguishes itself from other equipment manufacturers by owning its own R&D center and engineering design institute.
HZE distinguishes itself from many mining machinery enterprises by possessing an expert team with members including not only senior engineers of the company, but also top Chinese technical experts, university professors and researchers.

Mineral Processing Projects Mining Engineering Design
3. What are the characteristics of your company's 3D design?

HZE not only uses 3D software to design equipment, but also uses 3D software to design process flow, pipeline, steel structure, auxiliary facilities, etc. of the whole mineral processing project. We even use 3D design for equipment packaging, container packing and equipment instructions manual. This greatly improves the quality of equipment and engineering, shortens the construction period, facilitates technical discussion and evaluation, facilitates project management, improves construction safety and reduces project cost.

Mineral Processing Projects Mining Engineering Design
4.  What are the service features of your company?
  1. Customers who whether buy our equipment, or entrust us with EPC, or require us to provide a certain service, cooperate closely with us to carry out specific operations and supervise our implementation throughout the process.
  2. HZE will try to understand the basic situation and needs of customers as detailed as possible before the sale, formulate a preliminary plan according to the specific situation of customers, and get unanimous opinions after communications and discussions with customers to determine the plan.
  3. We set up customer files for every customer who signed the contract with us and upload them to the Cloud where customers can also get an account and password. Customers can have all the documents, videos and pictures, technology, services, execution, operation, management and control, maintenance and so on related to the business.
  4. Whether it is in the process of general contracting, equipment manufacturing or providing some kind of service, we welcome customers to know about our implementation on the spot or through the network, and put forward requirements and opinions.
  5. We assist users who have used our products to formulate operation specifications and make suggestions on maintenance plans and spare parts inventories. In addition to routine on-site installation, commissioning and training, during the production period after we handing over equipment to customers for use, we often understand the equipment using situations through the network and provide guidance and training to customer management and operators.
  6. For the clients who have just start the mining business, we provide the opportunity of training and practice in China's mines for the clients' employees, until they are skilled in operation and maintenance.
Mineral Processing Projects Mining Engineering Design
Mineral Processing Projects Mining Engineering Design

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier