• Efficient Mining Equipment High Recovery Gold Mining Trommel
  • Efficient Mining Equipment High Recovery Gold Mining Trommel
  • Efficient Mining Equipment High Recovery Gold Mining Trommel
  • Efficient Mining Equipment High Recovery Gold Mining Trommel
  • Efficient Mining Equipment High Recovery Gold Mining Trommel
  • Efficient Mining Equipment High Recovery Gold Mining Trommel

Efficient Mining Equipment High Recovery Gold Mining Trommel

Type: Gold Mining Equipment
Function: Gold Recovery
Main materials: Steel
Capacity: 1-800 tph
Certificate: Certificate: ISO9001:2015, ISO14004:2015, SGS:QIP-
Driving: Electric Motor, Diesel Engine
Customization:
Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Gold Recovery Rate
65-97%
Processed Raw Materials
Placer, Alluvial/Eluvial
Mounted Type
Portable, Mobile, Skid, Fixed
Warranty period
365 Days
Customization
Acceptable
Color
Multi, Selectable
Support Services
On-site investigation, Processing Design, Equipmen
Transport Package
Containerized
Specification
Small, Medium, Large Scale
Trademark
HZE
Origin
China
HS Code
8474100000
Production Capacity
1000

Product Description

Efficient Mining Equipment High Recovery Gold Mining Trommel

APPLICATIONS
In view of occurrence of gold in the different raw materials of placer, alluvial / eluvial deposits and allowing for small, medium & large scale of processing for mining, prospecting and batch sampling, HZE provides different wash plant combing mercury free processes and related complete sets of equipment, to recover gold with high efficiency and low cost, and finally produce gold ingots / bullions.

Efficient Mining Equipment High Recovery Gold Mining Trommel


FEATURES

Two kinds of washing plants can be chosen: one plant with trommel for few sticky raw materials, another one with scrubber and trommel for sticky raw materials (such as clay, laterite and kaolin).
The trommel adopts different aperture opening and various sieves (steel bar, stainless steel wedge, polyurethane) to treat different raw materials, improve screening efficiency and prolong the sieve life.
The wash plants have different structure types: portable, trailer mounted, skid mounted and fixed mounted for easy land transportation and quick on-site installation.
Compact arrangement and modularization are convenient for on-site training and operation.
According to the size of free gold, different equipment such as jig, centrifugal concentrator, sluice box or shaker table are equipped to the wash plant to recover coarse and fine free gold fully. The recovery rate is up to 97% and the recovered gold particles can be down to 40 microns.
The customer can select the electric grid or the diesel generator to supply power to the electric motors of the plant.


PARAMETERS

Wash Plant with Trommel
Efficient Mining Equipment High Recovery Gold Mining Trommel
 
Model Capacity
(t/h)
Trommel Dia.*Len
(mm)
Sieve Opening
(mm)
Water Consumption
(m3/h)
Power
(kW)
TWP-0513 5-10 500×1300 3-10 2-5 2.2
TWP-0615 10-20 600×1500 3-10 5-10 3
TWP-0715 20-30 700×1500 3-10 10-15 4
TWP-0815 30-40 800×1500 3-10 15-20 4
TWP-1015 40-70 1000×1500 3-10 20-35 4
TWP-1020 50-100 1000×2000 3-20 25-45 5.5
TWP-1225 100-160 1200×2500 3-20 40-75 7.5
TWP-1530 150-200 1500×3000 3-20 60-85 11
TWP-1545 180-300 1500×4500 3-20 70-125 15
TWP-1848 300-450 1800×4800 3-20 120-185 22
TWP-2055 400-600 2000×6000 3-20 160-250 30

Wash Plant with Scrubber and Trommel


Efficient Mining Equipment High Recovery Gold Mining Trommel
 
Model Capacity
(t/h)
Trommel Dia.*Len
(mm)
Sieve Opening
(mm)
Water Consumption
(m3/h)
Power
(kW)
STP-0513 2-5 500×1300 3-10 1-3 4
STP -0615 5-8 600×1500 3-10 2.5-4 5.5
STP -0715 8-12 700×1500 3-10 4-6 7.5
STP -0815 10-15 800×1500 3-20 5-7.5 7.5
STP -1020 25-40 1000×2000 3-20 12.5-20 11
STP -1030 30-50 1000×2000 3-20 15-25 15
STP -1225 50-70 1200×2500 3-20 25-35 15
STP -1530 70-100 1500×3000 3-20 35-50 22
STP -1545 80-120 1500×4500 3-20 40-60 30
STP -1845 90-130 1800×4500 3-20 45-65 37
STP -1860 100-140 1800×6000 3-20 50-70 45
STP -2060 120-160 2000×6000 3-20 60-80 55
STP -2160 140-180 2100×6000 3-20 70-90 75

RELATIVE EQUIPMENT

Efficient Mining Equipment High Recovery Gold Mining Trommel

Efficient Mining Equipment High Recovery Gold Mining Trommel


PACKAGE SOLUTIONS
After HZE knows the resource information of every client and communicate enough with the client, HZE determines the most suitable complete scheme which combining technology, processing, customized equipment, installation, commissioning and on-site training for the client basing on the actual information of each placer, alluvial / eluvial deposit and the client's demands, provides one stop service and turnkey project to reach the goals of environmental friendly, energy saving, consumption reduction and best profit.

CASES

Efficient Mining Equipment High Recovery Gold Mining Trommel

SUPPORTING SERVICES
Efficient Mining Equipment High Recovery Gold Mining Trommel

FAQ  


1.What is the main business scope of your company?
HZE is a company with R&D center, design institute, manufacturing factories, installation and commissioning teams.Our customers are in the mining and mineral processing fields.Our major businesses include mineral processing EPC (engineering, procurement and construction), project consultation, engineering design, mineral processing equipment manufacturing, on-site installation, commissioning, staff training, customer project operation management, spare parts supply and technical support.Customers are free to choose any one or any combination of our services.

Efficient Mining Equipment High Recovery Gold Mining Trommel

2.What are the outstanding advantages of your company?
The one-stop service of mineral processing engineering project and equipment is our core competitiveness.
The most important feature that HZE distinguishes itself from other engineering companies, design companies or consulting companies is that we are also an equipment manufacturer with a production plant of 50,000 square meters, and we have complete manufacturing rout and the related equipment.
HZE distinguishes itself from other equipment manufacturers by owning its own R&D center and engineering design institute.
HZE distinguishes itself from many mining machinery enterprises by possessing an expert team with members including not only senior engineers of the company, but also top Chinese technical experts, university professors and researchers.

Efficient Mining Equipment High Recovery Gold Mining Trommel


3.What are the characteristics of your company's 3D design?
HZE not only uses 3D software to design equipment, but also uses 3D software to design process flow, pipeline, steel structure, auxiliary facilities, etc.Of the whole mineral processing project.We even use 3D design for equipment packaging, container packing and equipment instructions manual.This greatly improves the quality of equipment and engineering, shortens the construction period, facilitates technical discussion and evaluation, facilitates project management, improves construction safety and reduces project cost.
Efficient Mining Equipment High Recovery Gold Mining Trommel

4.What are the service features of your company?
  1. Customers who whether buy our equipment, or entrust us with EPC, or require us to provide a certain service, cooperate closely with us to carry out specific operations and supervise our implementation throughout the process.
  2. HZE will try to understand the basic situation and needs of customers as detailed as possible before the sale, formulate a preliminary plan according to the specific situation of customers, and get unanimous opinions after communications and discussions with customers to determine the plan.
  3. We set up customer files for every customer who signed the contract with us and upload them to the Cloud where customers can also get an account and password.Customers can have all the documents, videos and pictures, technology, services, execution, operation, management and control, maintenance and so on related to the business.
  4. Whether it is in the process of general contracting, equipment manufacturing or providing some kind of service, we welcome customers to know about our implementation on the spot or through the network, and put forward requirements and opinions.
  5. We assist users who have used our products to formulate operation specifications and make suggestions on maintenance plans and spare parts inventories.In addition to routine on-site installation, commissioning and training, during the production period after we handing over equipment to customers for use, we often understand the equipment using situations through the network and provide guidance and training to customer management and operators.
  6. For the clients who have just start the mining business, we provide the opportunity of training and practice in China's mines for the clients' employees, until they are skilled in operation and maintenance.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now